New double-curvature arch-gravity dam
Replacement of the existing dam which was originally built in 1932. The new double-curvature arch-gravity dam is built directly in front of the existing dam which is preserved and subsequently flooded while a tunnel next to the old dam wall will ensure that the water level is balanced hydraulically. The new structure has the same crest height as the existing arch-gravity dam and offers the possibility of a height increase at a later stage in order to enlarge Lake Grimsel.
The Grimsel Lake can continue to function throughout the construction period, practically without restrictions.
The construction site is on the road over the Grimsel Pass, at a height of between approx. 1,800 m and 1,950 m above sea level (Grimsel Hospice).
Key data
Construction costs: approx. CHF 125'000'000
2023-2025
Kraftwerke Oberhasli AG (KWO)
Datum: 20.11.2023