Train maintenance facilities
Project
The NSIF project involves the design and construction of a new industrial building for train maintenance, including administrative spaces and logistics warehouses.
Key Data
- The building is divided into 4 main sections combined into a single volume, with a total of 850,000 m³ and 66,500 m² of gross floor area;
- Dimensions: 370 m in length, 170 m in width, and 24 m in height;
- Steel structure with reduced bulk and spans reaching up to 50 m in length;
- A portion of the building is dedicated to management and skills development, with offices, administration, procurement, and training rooms;
- Highly automated logistics with high localized loads on two levels and a distribution system using autonomous guided movers.
Total cost
Building cost: CHF 285 Mln
Total project cost: CHF 755 Mln
Pini fee (100%): CHF 2.9 Mln
Customer
Swiss Federal Railways (SBB)
Services
- Client's representative
- Project owner support
- High level supervision
- Support for design
- Independent Checking Engineer (ICE)
Project Phases
- Preliminary studies (SIA 21-22)
- Preliminary design (SIA 31)
- Final design (SIA 32)
- Permit-obtaining procedure (SIA 33)
- Tender design (SIA 41)
- Construction design (SIA 51)
- Construction (SIA 52)
- Commissioning, completion (SIA 53)
Data: 25.01.2019